Project site visit at one of our environmental infra projects in the outskirts of Davao City
By Dana Gabrielle B. Tautho
Project site visit at one of our environmental infra projects in the outskirts of Davao City
SITE VISIT | Project site visit at one of our environmental infra projects in the outskirts of Davao City. We help clients build infra projects or implement projects with peace of mind.#ridgetoreefinc#r2rconstruction
R2R Team in action for another proposed project
By Dana Gabrielle B. Tautho
R2R Team in action for another proposed project
IN ACTION | R2R Team solves and simplifies complex environmental requirements to help our clients implement programs or build infrastructure projects with peace of mind.#ridgetoreefinc#r2rconstruction
Kudos to R2R Bakal Boys for always being there when needed the most!
By Dana Gabrielle B. Tautho
Kudos to R2R Bakal Boys for always being there when needed the most!
BAKAL BOYS | Our heavy equipment in charge, from the mechanics to the operators, is one of our partners for a successful project. They love the outdoors, are patient, are always willing to get their hands dirty, are knowledgeable about the machines, and with a sense of ownership. They are our miracle workers because they ensure our old, rugged, and battle-tested machines are in tiptop condition and always safe to ...
Slope stabilization of the WWTF pond system
By Dana Gabrielle B. Tautho
Slope stabilization of the WWTF pond system
SLOPE STABILIZATION | This is for the WWTF pond system of this ongoing project. Good job R2R Bakal Boys!#ridgetoreefinc#r2rconstruction 
This design and build environmental infrastructure project under contract with R2R Construction is now in full swing
By Dana Gabrielle B. Tautho
This design and build environmental infrastructure project under contract with R2R Construction is now in full swing
TAKING SHAPE | This design and build environmental infrastructure project under contract with R2R Construction is now in full swing. Completion is just a matter of time.#ridgetoreefinc#r2rconstruction#enviinfraproject
Ongoing site preparations include slope stabilization for this project
By Dana Gabrielle B. Tautho
Ongoing site preparations include slope stabilization for this project
SITE PREPARATIONS | Ongoing site preparations include slope stabilization for this project. Kudos to R2R Bakal and Buko Boys for doing this part of the project on time.#ridgetoreefinc#r2rconstruction Photo by: Engr. Jerald Ygoña
Site preparation for R2R Construction’s ongoing environmental infrastructure project
By Dana Gabrielle B. Tautho
Site preparation for R2R Construction’s ongoing environmental infrastructure project
EARTHWORKS | Site preparation for R2R Construction’s ongoing environmental infrastructure project. Because R2R helps clients build projects or implement programs with peace of mind. For more info please visit our websites: www.ridge-to-reef.com, www.r2rconstruction.ph, www.ridge-to-reef.tv#ridgetoreefinc#r2RconstructionPhoto by: Engr. Jerald Ygoña and Jake Reodique
 Buena Mano sa 2022!
By Dana Gabrielle B. Tautho
 Buena Mano sa 2022!
BUENA MANO | Buena Mano sa 2022! Mobilization for the latest construction project of R2R Construction.  Kudos to Bakal Boys for the safe and successful deployment.  May the Lord continue to bless the work of our hands!#ridgetoreefinc#r2rconstruction Jes, Jerald
Presentation of proposed projects with LGU Island Garden City of Samal.
By Dana Gabrielle B. Tautho
Presentation of proposed projects with LGU Island Garden City of Samal.
Presentation of proposed Septage Treatment Facility (STF) for the entire Island City, Safe Closure of SLF Cell#1 and Retrofitting of Existing SLF WWTF/ mini Septage Treatment Facility of LGU Island Garden City of Samal.#ridgetoreefinc#ridgetoreef#r2rconstruction#islandgardencityofsamal
 R2R Design and Engineering Team visited the potential Wastewater Treatment Facility project at Calinan, Davao City
By Dana Gabrielle B. Tautho
 R2R Design and Engineering Team visited the potential Wastewater Treatment Facility project at Calinan, Davao City
Last August 25, 2021, the R2R Design and Engineering Team visited the potential Wastewater Treatment Facility project at Calinan, Davao City.#ridgetoreefinc#ridgetoreef#r2rconstruction